To: Barrington Hills Residents
Subject: 2003 Barrington Hills Road Improvements – Construction
Update
Date: September 4, 2003
Dear Fellow Resident:
This letter is to provide you with the first of several updates
on the roadwork that will be along or near your property. You
are receiving this letter specifically because you may be temporally
affected by the roadwork activities in the next 8 weeks. The
attached table shows the scope and location of the work.
Our intent is to minimize the disturbance to your property, landscaping,
utilities, and travel activities as much as possible. We are
also working to minimize the noise and general construction impact
from the perspective of being a distraction from our rural lifestyle.
The new road surface will be very similar in width and location
to the original road. We are not widening or relocating any of
the road surfaces.
Please recognize that this project, as in year’s past, is a significant
amount of construction work involving heavy machinery, moment
of material, and relocation of traffic. I ask for your patience
while we make these improvements near your property, and your
care while traveling through and around the construction site.
I certainly appreciate the inconvenience and we will do everything
we can to mitigate the impact.
The following covers several subjects regarding the project.
Since a wide variety of situations exist along the construction
routes, it’s possible you may have additional questions or special
concerns. Please contact me directly in this case and I would
be happy to assist you.
Update 12/01
Chicagoland Paving is now complete on Ridge Road, Meadowhall Road,
Church, and Haeger's Bend, with the exception of landscaping on
Haeger's Bend and some punchlist work items. The final surface
was completed on Haeger's Bend on Wednesday 11/26.
The drainage work by Prime Construction
is also winding down, as the culverts are all installed. Some
ditching and landscape work remains, as well as the final patching
for these improvements.
Update 11/18
Chicagoland Paving is planning to finish paving operations before
Thanksgiving.
1. Temporary Road Closures
During portions of the project, the following road segments
will be closed to thru traffic.
Ridge Road will be closed between Oak Knoll
and Merri-Oaks
Update
10/21 The final surface was placed on Ridge Road on
Saturday 10/18. The contractor, Chicagoland plans to place the
stone shoulders on Ridge Road during the week of 10/20.
Update
10/23 Landscaping (topsoil, seed, and erosion control
blanket outside of shoulders) is only remaining work on Ridge.
This will probably begin next week of 10/27.
Update
11/3 Weather permitting, landscaping will begin on
the week of 11/3 on Ridge.
Meadow Hill Road will be closed between Lake
Cook and Fox Hunt
Update 10/21 During
the week of 10/20 the contractor, Chicagoland is on Meadowhill
continuing the removal of cetain segments of the edge of pavement
and excavation of the shoulder. Paving is planned to start at
the end of the week. They expect to be there another day or
two, and then they are planning to begin paving Church and Meadowhill
towards the end of the week.
Haeger’s Bend Road will have intermittent
closures between Lake Cook and Chapel Road
Update 11/3 Chicagoland
plans to start patching on Haeger's Bend on Wednesday the week
of 11/03.
Update 11/18 The
contractor is planning to resume on 11/19 patching on Haeger's
Bend Road , and placing level binder by the end of the week.
They will be placing petromat on Meadowhill on Thursday, with
the final surface on Friday.
Church Road will be closed between Chapel
Road and Algonquin / River Road
Update 10/21 The
contractor expects to start paving at the end of the week of
10/20.
Local and emergency traffic will always be allowed through.
These road closures are necessary because the poor condition
of the original pavement sections and the narrow area in which
the construction crews are to work. In order to protect the
safety of the construction crews and people traveling on the
roads, it was determined that the best course of action is to
close certain roads sections during a portion of the project.
While road closures are an inconvenience to our residents, it
will help to speed up the construction schedule allowing us
to return the roads back to normal service sooner.
We are working to schedule to closures so that they do not
happen simultaneously. We will provide additional information
on the road closure schedule, and detours will be well marked
in advance of the closure.
Update
9/17 The contractor has given us an updated timetable
for the Ridge Road construction between Oak Knoll to Merri-Oaks.
Crews will be on-site between Monday (9/22) to Friday (9/26).
Only local traffic will be allowed through the construction
area. Alternative routes include (1) Haeger’s Bend to
River/Algonquin Road, east on Plum Tree to Rt. 14; or (2) New
Hart Road to Rt. 14. Please be careful – caution is strongly
advised.
Update 11/18 Prime Construction
began work on the drainage projects on Friday 11/14, and will
continue working the week of 11/17. Friday they were grinding
out butt joints, and Monday they replaced the culvert at the
Chapel & Haeger's Bend. On Tuesday work is to occur on the
culverts at 220 Braeburn, and Wednesday they are planning on
working on the Cuba Road culverts. Please note that this portion
of Cuba Road will be closed during the construction. All driveways
on Cuba are located to the north of this crossing, so access
to these residences will be maintained from Rte. 14/ Plum Tree.
2. School Bus Pick-Up
We have been in contact with Barrington Transportation Company
and we will be coordinating with them regarding the temporary
roadway closures. You will receive additional notification of
any changes in school buss pickup. Barrington Transportation
Company can be reached at 847-381-1043.
Update
9/15 The buses will avoid the sections of Ridge and
Meadowhill that have been closed, and students will be instructed
to be picked up at the ends of the construction zones starting
on Wednesday 9/17. Ms. Sander said she will send this information
with the bus drivers to inform the affected students.
3. Stakes and Markings
Some of you may notice stake markings along the construction
routes set back some distance from the existing road surface.
In the past people have misinterpreted these as the location
of the new roadway. This is NOT the case. These markings are
set back away from the work area to provide stable reference
points for the construction work; they are not representative
of actual pavement location.
4. Landscaping, Mailboxes, and Driveway Aprons
We have taken photos and documented the landscaping, driveway
aprons, mailboxes, and other signage along the construction
route. We are always very conscious of these elements during
construction. However, some disturbance is inevitable during
this kind of project. We are committed to returning your landscaping
elements to their original condition by the end of the project.
If you plan on moving your driveway or making other significant
changes regarding your property as it adjoins the roadway, this
would be a good time to bring it to our attention. By coordinating
our efforts, we can avoid confusion and lower the costs of the
work both to you and to the Village.
For those of you interested in driveway paving, or upgrades
to private roads, we can put you in touch with our contractors.
While the Village does not pay for these services for you, you
might find you can get a good price since the work can be coordinated
with adjoining Village activities.
Thank you once again for your assistance and patience during
the construction operations. Please call me if you have any
comments or questions regarding this project. You may also
contact Michael Lukich, Assistant Village Engineer at 847-344-4498,
or our Village Administrator, Bob Kosin, at 847-551-3004.
I appreciate your patience during this difficult construction
project. We expect to be finished with this project before
the 1st of November. I believe you will find that the new roadways
will be a substantial improvement over past conditions. If
you have any further questions, please give me a call at 847-381-8174
or e-mail at Bob@RGALabs.com.
Sincerely,
Robert G. Abboud
BH Village Trustee
Chairman Roads & Bridges
13 Country Oaks Lane
Barrington Hills, IL 60010
Bob@RGALabs.com
Home: 847-381-8174
Office: 847-381-1932
Cell: 847-921-1932
Village of Barrington Hills 2003 Road Repair
Scope
September 4, 2003
| Module |
Road Name |
Length
in Mi |
From |
To |
| 1 |
Ridge Road |
0.74 |
Oak Knoll |
Merrin Oaks |
| 2 |
Haeger's Bend |
0.91 |
Spring Creek |
Lake Cook |
| Church - resurface |
0.70 |
Chapel Road North |
River Road |
| 3 |
River Road |
0.87 |
Turner Camp |
Braeburn Road |
| River Road |
0.50 |
Haeger's Bend Road South |
Village Limits |
| 4 |
Meadow Hill - resurface |
0.24 |
Fox Hunt |
Top of Hill |
| Meadow Hill - Ditch work |
0.00 |
Spring Creek |
Fox Hunt |
| 5 |
Cuba Road - Culvert Removal |
n/a |
Plum |
Merri Oaks |
| Plum Tree - Hill embankment |
n/a |
780 Plum Tree |
|
| Plum Tree - Culvert |
n/a |
Jane Lane |
Jane Lane |
| Plum Tree - Culvert |
n/a |
Surrey |
Surrey |
| Plum Tree - Drainage |
n/a |
734 Plum Tree |
734 Plum Tree |
| Plum Tree - Ridge Intersection |
n/a |
Ridge Road |
|
| Plum Tree - general patching |
1.22 |
Village Limits |
Ridge Road |
| Haeger's Bend - Drainage |
n/a |
Chapel Road Intersection |
Chapel Road Intersection |
| Dundee Lane - Drainage |
n/a |
South of Rt 68 - east side |
|
| Old Dundee Road - Drainage |
n/a |
West of Rt 59 - north side |
|
| Spring Creek Island Improvements |
0.00 |
n/a |
|
| Spring Creek Repairs |
0.00 |
West of Bow Lane |
|
| Butternut - Culvert |
n/a |
248 Butternut |
|
| Oak Knoll - Culvert |
n/a |
200' west of Old Hart |
|
| Steelple Chase - culvert |
n/a |
236 Steelple Chase |
|
| Braeburn - Culvert |
n/a |
209 Braeburn |
|
| Hawley Woods - Culvert / Guard Rail |
n/a |
North of Old Dundee |
South of West Lane |
| 6 |
Chapel Road |
0.08 |
New pavement lip |
Church Road |
| 7 |
Aberdeen Drive Repairs |
0.00 |
east end |
west end |
| |
Total |
5.25 |
|
|
|